Each pool installation typically requires some form of excavation works, whether it be a minor site preparation for an above ground pool or digging a hole for an in ground swimming pool.
Standard machinery involved includes an excavator (digger) and a bobcat. The bobcat is used to load the excavated soil into a kerbside tip truck which transports the soil to the closest tip.
Sometimes our clients have limited width which means the bobcat is not able to be used to remove the dirt.
See the video below of a recent pool installation in Melbourne’s south east with limited access for machinery.
If you have limited access, give Endless Pools a call today to discuss your options. View the Endless Range of Pools.